Showing posts with label Husband Pullover. Show all posts
Showing posts with label Husband Pullover. Show all posts

Friday, 10 July 2015

July WIPs

Here are the things I am currently working on:

"Wee Melia" by Ysolda Teague in RipplesCrafts Merino DK "Gunther's Seat"


I bought the wool for this at the Highland Wool Festival in Dingwall in May. Helen pulled out the colour to show me as soon as I walked into her booth, then clinched the deal by having a shop sample knit up in warm gold for Little Djinn to try on. It's like she knows me or something. I cast it on as soon as we got home, but Little Djinn spotted the then-latest issue of Knit Now magazine that arrived that morning with a kit to knit a little doggy and she insisted I knit that post haste. Wee Melia was ignored for the Hapalong and MKAL but I have a few days before the Scollay-along starts so maybe I can finish the hood.

"Brainless Socks" by Yarnissima in Opal Cotton Premium "Ozean"


I started these back before Easter time. They're 30% cotton which will make them better for warm spring days although it's July and I'm either wearing my wool socks or going barefoot with a lot more of the former. This is my walking around project and I am almost done with the gusset increases on the second sock. Let's all please take a moment to admire the fact that my stripes line up. Mad skills, yo. Obviously this could all go to pot when I turn the heel.

In the languishing pile we have "Harringbone Rib Socks" by Kristi Schueler in RipplesCrafts BFL Sock "Ola"


These are for Chris and, yes, he picked the colour. The pattern is a two row repeat and I keep forgetting which row I'm on, usually mid row. The yarn is also really skinny, making progress almost as slow when I work on them as when I don't. They're not watching Telly knitting, which is currently as much attention as I can spare a knitting project. I'm on the second sock so I really don't want to frog them and start over with a different pattern :-/

"Terry's Pullover" by Carol Feller in Jamieson & Smith Aran "Olive"


This one keeps losing out to shinier projects. I knit to the armholes and started on the sleeves before admitting my fabric would stop bullets and it would never fit. I frogged it, went up on both the needles and pattern, and started again. I started with the sleeves, two at a time, to check my gauge, and then couldn't find them when it was time to join them to the body so I figured I'd graft them on at the end, which is where I am now. The first sleeve went on easy enough, but the second on wasn't lining up for the 2x2 rib racing stripes. After two days of trying I put it in time out and there it sits. 

Meanwhile I am swatching for the Scollay-along. I usually have to go down on the needles so I started with 3.75mm needles and my unblocked swatch is 20x28 with a blocked target of 22x30 so I'm close. I'm swatching on the recommended 4.0mm needles as well and I'll block them at the same time to see what I get. CO is Sunday, which is a work day for me.





Saturday, 12 January 2013

39 Weeks, Oh My!

Apologies for the particularly bad mobile phone/mirror picture this week. Chris came for a snuggle and I didn't want him getting bored and wandering off (his forbearance for being photographed is greater than that of the kitties, but not unlimited). We've made it to 39 weeks, 6 days to go (give or take actual arrival date, of course). I'm hoping to be a few days to a week late but not need to be induced so next Saturday is when I start eating pineapples or spicy food, drinking raspberry leaf tea, and bouncing up and down on my exercise ball all day. Until then, it's lying on my back with my feet up and my knees crossed. Or cleaning the house in preparation for my mother's arrival on Wednesday, whichever actually happens. The sad thing about my mother arriving is that I'll have to move out of the nursery/guest bed and poor Chris will be kept awake all night with my snoring. Even in a non-adjacent room, wearing ear plugs he can sometimes hear me. This is why I try and read for an hour or so after going to bed, to give him a chance to fall asleep before I do. Honest, it's for purely altruistic purposes and not because I'm a bookworm

Speaking of books, Mira Grant's Newsflesh Trilogy has been my latest form of crack. It's about a(n adopted) brother-sister team of bloggers and their crew some twenty years after the cure for the common cold and the cure for cancer got together to turn the recently deceased into zombies and the government conspiracies they unearth. I'm not a fan of the zombies, this and World War Z (has that movie come out yet? I live under a rock) are pretty much the entirety of my exposure to the genre. Oh, I've seen Shaun of the Dead and that movie where the kid has the rules for surviving a zombie apocalypse. Anyway, Newsflesh is as good as everyone said and if her urban fantasy series published under her own name, Seanan McGuire is anywhere near as good, I will be a very happy bunnybookworm.

On the knitting front things are looking less optimistic. The baby blanket/shawl is coming along nicely, I've knit the border along the first side and turned the corner, but everything else is in the frog pond.* The socks for my mother, I'm convinced, are not going to fit. They're a little long and too tight to go over the heel. I can't really try them on because my own feet, ankles, and legs are swollen but I'm convinced they're all wrong. Plan A is to knit the second sock to be the size I think it should be and then when she arrives I can frog whichever sock is the naughty one and reknit it. Chris' pullover otoh just needs to be frogged. I knit a gauge swatch but I'm not happy with the size it's coming out. I had him try on the body and it was quite snug which, combined with the denseness of the fabric, means it'll be too hot and not comfortable enough for him to actually wear. It took forever to knit in the first place, but I don't want to finish a sweater just to have it finished and not be worn. So I'll frog it and go up half a mm on the needles and start again at some vague point in the future.

On the more optimistic side, I have acquired *cough* yarn to knit Ravi Junior which is another Carol Feller pattern. It starts at the 6 months size but I think I'll do the next size up for Little Djinn to wear in the Autumn/winter. Not that a cardigan would go amiss in our Scottish "summer". I also acquired yarn for Snawheid and the matching mitt(en)s, Snawpaws. I don't actually know that I have enough yarn for both, but I'll knit the hat and see how much I have left.

~ * ~

* unravelling knitting is known as "frogging" because the stitches make a small "ribbit" sound as one pulls them apart. This sound used to make my husband cry, but he's become jaded to hours of knitting wasted.

Sunday, 30 December 2012

New Year's Resolutions

Last year, I set for myself two goals: acquire more sock construction techniques and knit two (adult) sweaters. Then, as is often the case, life got in the way. I did fairly well on the socks, trying out several different heel and toe techniques, of which the most recent was short-row heel and toe for a pair of baby socks that will sadly be frogged as I ran out of yarn. Oops. My favourite techniques are most likely the Dutch or square heel and Kitchener stitching a wedge toe. That said, I like toe-up socks best.
I did less well on the sweater front, at least as far as adult sweaters go. My husband's sweater is maybe 70% finished - I've knit the body up to the arms and am working on the sleeves. I bought my husband a pullover for Christmas. My own jumper got exactly nowhere for obvious reasons. I'll take measurements again some point in the future, at least three months post-partum. As far as baby sweaters go I knit 4.5 sweaters, one of which was a pattern I'd done before (teal). Most were knit top down in one piece, one was knit flat in one piece and then seamed up the sides and under the arms (green). As baby sweaters, especially for a theoretical baby, aren't expected to fit the same way adult sweaters need to, I don't count them for my NYR.

I have 22 finished projects for 2012, 4 still in progress, 1 frogged, and 2 hibernating. Oddly, both of the hibernating ones use the same yarn. Most types of projects goes to cowls of which I knit 9 (three using the same pattern) thanks almost entirely to the Great Cowl KAL last February and March. Second most projects was socks, with 5 finished in 2012 (two started in 2011) and another two on the needles. One pair is maybe an hour's work from being finished so I may make it to 6 finished pairs of socks yet.

I am not setting any resolutions for next year although I suppose "finish the things I currently have on needles plus the nursing cardigan" count as goals. That would be 5 projects: husband sweater (70% finished), socks for my mother (almost done with first one), baby blanket/shawl for Little Djinn and the Wishbone socks for me that I mentioned were close to finished, and the just mentioned cardigan for nursing. They're all also things I'd like to have before Little Djinn arrives in 3 maybe three weeks which no doubt explains why I started a new cross-stitch project today.

Tuesday, 18 December 2012

Almost Ready for Christmas

I'm watching The Nutcracker with Mikhail Baryshnikov and Gelsey Kirkland (which I started when writing my last post but only got to the battle with the Mouse King so that's where I resumed today). It's very 70's, the film quality isn't great, and I know he was an ass and she was not mentally healthy, but lord can they dance. He powers through leaps and turns like it's as easy as breathing and she floats across the stage with such grace. They are both amazingly talented, as are all the dancers in the production, and of course I love Tchaikovsky's music.

I am making cinnamon rolls using the ever-popular Pioneer Woman's recipe. We're at the "dough is rising" stage and the house smells yeasty and lovely. I made a Christmas Pudding a few weeks ago (though apparently it should've been done in November, possibly early November. Ooops) and it's "ripening" in the garage. My first Christmas pudding was a gift from Andy and Charlotte and came with the directions "cook in the usual manner" which meant absolutely nothing to me. When making a Christmas pudding you combine all of the ingredients, steam for 3 hours, and then set aside for days, weeks, or even months until Christmas when it gets steamed for another 3 hours and served en flambé with a variety of cream sauce options. I don't see any other particular Christmas "baking" in our future, though I suppose there's always time to have an overwhelming urge for sugar cookies. We'll do the "Christmas Triffle" from last year's Delicious magazine as a New Year's treat. We've tentatively decided on "Thanksgiving light" for Christmas dinner - turkey breast, cranberry sauce, green beans, mashed potatoes, and hopefully Brussels sprouts if we get them in our veggie box. Brussels Sprouts are the difference between Christmas and Thanksgiving.

We went out to dinner with Chris' Highland Web Developer's group. They meet once a month on a Tuesday night at the same place as my knitting group (though we're in the café and they're off in a meeting room) so it's easy for us to both go that week. Chris hadn't mentioned that we're expecting and they seemed rather chuffed for us. We went to a pub, then dinner at a restaurant, and then to another pub. Chris and I called it a night after that (I'd gone straight from work) but the last stragglers went on to a night club. It was nice to meet Chris' friends.

I am making progress on Chris' pullover. Casting on the sleeves did scratch the start-itis itch and having transferred the body to two sets of cabled needles (freeing up my only 3.0mm for knitting the sleeves, two-at-a-time, magic loop) I was able to have Chris try it on and, luckily, it does fit. I also realized that the pullover was designed by the same woman, Carol Feller, who wrote one of my new knitting books, Contemporary Irish Knits so I guess I've been a fan of hers longer than I realized. I also cast on a little something for my Secret Santa at work which I hope to have finished tonight, though I have until the 24th to drop it off, not that I want to go into town on Christmas eve.

We're all done with our prenatal classes except the partners physiotherapy class on Thursday. Friday I will be 36 weeks with 4 weeks to go, though today also marks exactly a month to my due-date. Count-downs are funny like that. I have an ultrasound scheduled for Friday and need to book an appointment to see my midwife for another (last?) round of bloods. I have two more (half) days of work, tomorrow and Friday; we're having dinner with friends tomorrow and I'm having lunch with another friend Thursday. I am hoping to make it to knit night tonight and that's everything planned between now and Christmas.

Thursday, 13 December 2012

It's Snowing! Also, I'm Knitting!

Just before 1pm today, my husband came downstairs with very important, it can't wait, news for me: it was snowing. Only just barely, the kind of snow where one could count each and every snowflake as it drifted slowly from the heavens but finally, finally, at long last, it was snowing! It took about 15 minutes to build up to a snowfall worthy of the verb and has been snowing at a steady if not heavy clip ever since. I have spent the afternoon doing figurative cartwheels. Over breakfast this morning (after my final prenatal physiotherapy class, though there is a class for both partners next week) I'd asked if it was okay to complain about several days of bellow-freezing weather without snow. I think the frost is lovely, but if it's going to be -8C/17F there bloody well should be snow on the ground. The universe seems to agree with my argument as we finally have snow! I honestly didn't think we'd get any before Christmas. The sun set (at 3:30) without my having taken a picture, so I'll show you this one from last April:
There actually is knitting news this week as I have finally finished the only knitting I really need to have done before Christmas: a pair of mitts for Aged Parent. As you may recall, he was the perfect knitting gift recipient last year , thrilled and touched and bragging to everyone he met about the hat I knit him. The man deserves more hand-knit things. I bought another skein of yarn, really soft wool to last year's camel hair, from the same Scottish yarn company, Shilasdair. I picked Dashing Mitts from Knitty, a pattern I had previously used for my husband and knew would work well. They're quite snug on me, but my FiL lost a fair bit of weight last year with tummy problems that have recently been diagnosed and, he says, cleared up, so hopefully they'll fit him nicely with a bit of room as he regains weight.
That leaves my purple orkney tam which I'm thinking I may give to my mother for Christmas, the self-striping socks I'm definitely knitting for her (I'm past the heel turn and working my way up the leg on the first sock), neither of which need to be finished until she arrives mid-January; the Shetland baby blanket/shawl for Little Djinn with pretty much the same due date; a few small projects for Secret Santa type gifts; an inch or two of a pair of socks that were tight before I got pregnant and my feet expanded; and the pullover I started for my husband. I don't think I've mentioned his sweater since I selected the pattern back in December as part of my New Year's Resolution, beyond a mention that the yarn had arrived. My 2012 has been very different from what it looked to be like from 2011 - which is fine, that's what living is all about - and while his sweater has mostly languished, I did make a fair bit of progress on the (less than interesting) stockinette body before I got pregnant and just tonight split for the armholes, to be followed shortly after finishing this post by casting on sleeves. The most awkward thing has been knitting a 37" sweater on 40" needles, the only ones I have in this size. I don't even have a pair of DPNs in 3.0mm, these are my only needles. This has periodically proven irritating as I've wanted to knit something else on 3.0mm and chosen to table it or go with a slightly different needle size instead. I'm not entirely sure why I haven't purchased another pair of needles except that there aren't any options locally and for whatever reason I haven't gotten around to ordering a pair. So I've been doing an awkward version of Magic Loop with a couple of inches of cord. Fortunately I'll not be dealing with as many stitches from here on out so the going should be less awkward and thus faster.

Those are the things I currently have permission to work on and I gotta say, I'm ready to cast on about 20 new things. I finally used the gift card Tonnvane gave me for my birthday (back in May) to buy two knitting books: Contemporary Irish Knits by Carol Feller from which I am itching to knit the matching cowl and mitts with some Old Maiden Aunt Alpaca/Merino I have in stash - I figure the sweaters will have to wait till post-Djinn and the completion of the current Husband Sweater; and Essential Knits for Babies by Debbie Bliss who makes one of the best commercially available yarn for babies out there. I figured the book had been on my wish list long before I knew I was pregnant and, while I'd knit things for Little Djinn, knitting is something I do for me so it counts as a present for me rather than a present for baby.

Which brings us to Little Djinn and my progressing pregnancy. I will be 35 weeks tomorrow with 5 weeks left to go. I've started occasionally suggesting to Little Djinn that the outside world is a beautiful place (now with snow!) and wouldn't you like to see it, which Chris objects to but I don't want to shock Little Djinn by saying "stay inside where it's safe and warm!" for 9 months and then suddenly saying, "it's eviction day! Get out!". Also, I'm ready to be done even if Little Djinn isn't. This week is fine, the week between Christmas and New Year's is problematic, but then any time is good for me, though the sooner the better. I think it's useful to communicate this, along with encouragement to be a 7lbs baby.

I have an ultra-sound and an as-yet unscheduled appointment with my midwife next week and that Friday is my last day at work. I am so ready to be done with work, though if I accept my limitations and spend most of my shift sitting on a stool behind the till it's okay. I had to buy larger boots (up a size and in wide) to accommodate my growing and sometimes swelling feet, especially in winter-thick socks. As it is, I'm just about to the point where Chris will have to do my shoes and socks for me as attempts to reach my feet are awkward and trigger heartburn. Not fun. Other not fun things include bending over last week to get something off the bottom shelf at the grocery store and feeling my epigastrum split apart. I asked the physiotherapist about it today as it's still sore and she said it's a soft-tissue injury common to pregnancy (which I knew) and all I can do is rest it, which I also knew but I made the mistake of googling it to reassure my husband and came up with the possibility of epigastric hernia. But even if it is herniated, there's nothing to do until after Little Djinn arrives, and it's nice to hear a medical professional be unconcerned.

The nursery still needs the decals stuck to the walls, though the bed is in place and fully made-up for my mother. I even put a blanket over the duvet to keep Oliver and Libby from shedding it, though it's the fake-fur one that they like to knead and purr on, so I'm probably just teaching them to love the bed. But on nights when my pregnancy-blamed snoring keeps Chris awake he'll be able to relocate to the nursery and actually get some sleep.

All of the Christmas decorations that are going up are up. I finally bought lights for the tree and put the one-off decorations up and a small handful of my plastic icicles. The baubles, fake candy canes, and rest of the icicles can stay off as one less thing to deal with come January. I got our North American Christmas cards posted, though the UK ones need to be signed and assembled.

Yesterday would have been my father's 72nd birthday. I don't think I have an emotional response to that, though I was a fair bit crabby. I think the crabbiness was more to do with having a new Assistant Manager at work and, subconsciously, resenting the fact that I have to take direction from someone I don't trust. Once I came home I was fine, even being up to hoovering and (electric) mopping upstairs and spending an hour making dinner. Though after that I was completely exhausted physically and even took another awkward bath. Did I mention that, as much as I love feeling Little Djinn growing inside me, I'm ready to be the sole occupier of my body again?

Sunday, 23 September 2012

Actual Knitting Content

I was finally feeling well and inspired enough following my 20 week scan (ironically the worst day of my cold which continues to linger) to knit again, casting on and finishing a little baby sweater in a week. I say "finishing" but it is still waiting for the perfect buttons and an I-cord button-hole band to be attached once they're procured. I have my eye on some adorable ones but need to wait until I get paid later this week to acquire them. Decent pictures will have to wait until there's a nice sunny day: as you can see, my current attempts are all dark.

The pattern is Garter Yoke Baby Cardi by Jennifer Hoel and I knit it with one skein of Ripples Crafts Sportweight in "Red, Red Wine". Not the most gender-neutral colour in the world, but I love that maroony-purple. Chris wants me to knit baby sweaters in mustard and moss but they're not colours I enjoy looking at. I highly recommend both the pattern and the yarn as they were a delight to work with.

Having started and finished an entirely new project, I decided I should really finish some of my languishing projects, if for no other reason than it shouldn't take long and I was out of project bags. First up were my Narcissus Pseudo-Narcissus (daffodil) socks from The Knitter's Curiosity Cabinate by Hunter Hammersen, knit in Old Maiden Aunt's Superwashed BFL colourway Emerald City. Again, a delightful pattern and a lovely yarn which together created a fairly eye-popping pair of socks. They were supposed to be a pair of spring/early summer socks as I started them back in March as soon as the e-book came out and I acquired appropriately coloured yarn but I am enamoured of them enough to wear them as often as they're clean even though I'm otherwise feeling very autumnal.

My current project resurrected from the bottom of the of the UnFinished Object (UFO) pile was Royal Blue Zum Dirndle socks I cast on a year ago. They're a Yarnissima pattern being knit with Wollmeise Twin 80/20 (no link as the page is all flash and in German). I ran into problems when my yarn cakes, wound without the assistance of a swift or ball-winder, started getting tangled and then I realized I didn't have nearly enough yarn and wouldn't be able to find more from the same dye-lot and I couldn't bring myself to work on them. I've since made my peace with having crew socks, not knee-highs and they're growing again.

I went to the knitting night* at Eden Court, my local performing arts center (Tuesdays, in the cafe) last week as it was also Chris' monthly Web Developers group meeting (Normally somewhere in the Bishops Palace but that night in the Green Room). It was a small gathering, only five other people while I was there, which was actually really nice because we were all able to participate in the same discussion and I felt very welcome and included. My enjoyment of previous knitting nights I've attended has largely depended upon whom I found myself sat next to and the accessability and inclusiveness of their conversations. There have been nights when I've been sat between two conversational groups, part of neither, and those aren't much fun. For mindless, conversational knitting I chose Husband Pullover from Interweave Knits Holiday 2009 issue, knit in Jamieson & Smith Shetland Aran in a mossy green. We're starting to have temperatures where Chris could actually use such a warm jumper. I'm not overly enamoured of all the garter stitch but I'm almost ready to split for the front and back, at which point it should be interesting again.

Chris' sweater is one of my New Year's Resolution knits (knit a sweater) and that my resolution to do so for myself is postponed owing to my rapidly expanding waistline. But I've got my eye on some interestingly constructed socks to continue the other half of my resolution. Speaking of my rapidly increasing waistline, because there's been interest expressed else-net, here's me at 23 weeks:

~ * ~

* I say knitting but only two of us were: one woman was using a sock "machine" and I use the term loosely, and another two were cross-stitching