Sunday, 30 December 2012

New Year's Resolutions

Last year, I set for myself two goals: acquire more sock construction techniques and knit two (adult) sweaters. Then, as is often the case, life got in the way. I did fairly well on the socks, trying out several different heel and toe techniques, of which the most recent was short-row heel and toe for a pair of baby socks that will sadly be frogged as I ran out of yarn. Oops. My favourite techniques are most likely the Dutch or square heel and Kitchener stitching a wedge toe. That said, I like toe-up socks best.
I did less well on the sweater front, at least as far as adult sweaters go. My husband's sweater is maybe 70% finished - I've knit the body up to the arms and am working on the sleeves. I bought my husband a pullover for Christmas. My own jumper got exactly nowhere for obvious reasons. I'll take measurements again some point in the future, at least three months post-partum. As far as baby sweaters go I knit 4.5 sweaters, one of which was a pattern I'd done before (teal). Most were knit top down in one piece, one was knit flat in one piece and then seamed up the sides and under the arms (green). As baby sweaters, especially for a theoretical baby, aren't expected to fit the same way adult sweaters need to, I don't count them for my NYR.

I have 22 finished projects for 2012, 4 still in progress, 1 frogged, and 2 hibernating. Oddly, both of the hibernating ones use the same yarn. Most types of projects goes to cowls of which I knit 9 (three using the same pattern) thanks almost entirely to the Great Cowl KAL last February and March. Second most projects was socks, with 5 finished in 2012 (two started in 2011) and another two on the needles. One pair is maybe an hour's work from being finished so I may make it to 6 finished pairs of socks yet.

I am not setting any resolutions for next year although I suppose "finish the things I currently have on needles plus the nursing cardigan" count as goals. That would be 5 projects: husband sweater (70% finished), socks for my mother (almost done with first one), baby blanket/shawl for Little Djinn and the Wishbone socks for me that I mentioned were close to finished, and the just mentioned cardigan for nursing. They're all also things I'd like to have before Little Djinn arrives in 3 maybe three weeks which no doubt explains why I started a new cross-stitch project today.

2 comments:

  1. I feel kind of staggered by how productive you are with this stuff. I'm not good at making things like this.

    ReplyDelete
    Replies
    1. Productive is such a strange word to apply to something I do while sitting on my bum :o)

      Delete